On-site industrial complex "Petmol on the corner of Bypass Canal and the Moscow prospectus will be built multi- quarter, Vedomosti.
Approximately 70% of its area will be occupied by residential real estate developer acts Construction Company "Breeze". It is true that construction would begin no sooner than two years: only the year will be spent on coordination of the project.
The concept of development is still under development, but real estate is definitely not. In the former industrial area near the subway is logical to build mass housing.
nevastroyka.ru
Tags: house , apartment , house , feed , quarter , milk , draft Promoted Videos
- Heat Networks
Thermal network. In areas of the old layout of the building satisfied input directly from the street thermal network. In the neighborhoods of the new residential construction supply heat for the heating system is usually carried out by heating units, fueled by the city's backbone network. Barrio Adentro pave the distributing network, supported by individual buildings. If you can not get heat from the plant include [...] - In the field of branches to the buildings and the ramifications of thermal networks
In the field of branches to the buildings and the ramifications of heat networks provide fixed support, and the points of entry of heat into the building design panel still supports the protection against the penetration of gas into underground or basement of the channels of heat networks. If on the local conditions of their setting is impractical, admit as an exception, the unit of special gas-tight seals. [...] - Methods of laying underground networks
In the design of underground networks to achieve the most economical solution, which is especially important for new areas of mass housing construction. Economical solution is determined by: the smallest length of pipelines with a minimum number of wells and chambers, the application of precast concrete channels and wells, mechanical ways of laying underground networks. Currently, three methods are used for laying pipelines and cables: a separate [...] - Combined strip in anadromous and semi-channels
To take full advantage of the combined placement of underground networks in continuous or semi-channels between the building houses the heating ducts, hot and cold water, low pressure gas pipeline and power line cable and phone. This significantly improves the organization of work of laying underground networks, especially in winter time: the construction of channels is performed simultaneously with the installation of underground parts of [...] - Location of sidewalks
Depending on the location of buildings along the main roads intra arrange one or two of pavement width on 1,5-2,25 m. Sidewalks may be placed directly in the roadway or separated from the last strips of greenery. In cases where the main flow of pedestrian traffic are sent on special pedestrian walkways that does not coincide with the direction of the main intra-roads, which [...]
Categories: News